Every gate, lane and door, measured and drawn
Half a day on site measuring lane widths, counting traffic at each peak, and drawing the result against your own layout.
- Prepared for
- Your company
- Site
- To be agreed
- Time on site
- Half a day
Measured per lane, with the queue at each peak and the layout drawn against it.
- Every barrier, reader and camera, placed02
- Measured throughput at each peak04
- Power, network and cable runs05
- Your gaps, and what closes them06





